This week I continue testing my circuit at the LAB 209 with guidance from Sir Syazwan and Sir Zubir. Unfortunately, my circuit did not functioning. I need to troubleshoot the circuit for the next week until the circuit is functioning well.  

Week 4 (FYP 2)

This the step of PCB layout of my circuit. It takes a few weeks to complete it.





Week 3 (FYP 2)

Last week, I managed to buy some components for my circuit. I had bought all components of my circuit. This is the place that I bought the component, recommended by Sir Syazwan.




Week 2 (FYP 2)


This is the circuit that I am going to construct. The table below show the component that I am going to use to construct it. This component for two circuits.


Week 1 (FYP 2)



For the first week of semester September, I proceed with construct the circuit. Start searching and buying the component.

Monday, 15 April 2013

Week 10 (Presentation Day)



ASSESSORS 
  1. Sir Hisham bin Mohd Desa
  2. Madam Naszariah Mohd Noor
Sir Syazwan wished us luck. My presentation went quite well. Surprisingly Sir Hisham has shown his interest in this project. He suggested the movement that will be produce from the EMG signal, will move thewheel chair / simulator LCD forward and backward only. For the left and right movement KIV.  This is my project and I have planned it from scratch so again. The assessors' suggestions or comments are really important and I have to take them into account. There were no problems with the design except for the movement of the wheel chair. Thank you lecturers.




Sunday, 14 April 2013

Week 9


For this week,

  • The presentation slide, done
  • The process of the devices works, done
  • Demo my presentation to my supervisor, done

And  a few more weeks before the end of Part 1 of FYP.
Yeyyyy  :))