Below the video that prove my circuit is functioning.
NAME : Siti Nur Adila binti Azman | ID : 51216111040 | PROJECT SUPERVISOR : Sir Mohd Syazwan Md Yid
Sunday, 19 January 2014
Week 11 (FYP 2)
Alhamdulillah, finally the circuit functioning well. This is because, I forget to placed the EMG ground. The picture shows the result that I got.
Week 10 (FYP 2)
Alhamdulillah. Finally, I found the electrode. Actually it is from my friend, who had ordered it from eBay.
Week 9 (FYP 2)
For this week, my circuit still not functioning. But I continue to search electrode, because it is difficult to find the right electrode in Malaysia.
Week 7 (FYP 2)
This week I continue testing my circuit at the LAB 209 with guidance from Sir Syazwan and Sir Zubir. Unfortunately, my circuit did not functioning. I need to troubleshoot the circuit for the next week until the circuit is functioning well.
Week 3 (FYP 2)
Last week, I managed to buy some components for my circuit. I had bought all components of my circuit. This is the place that I bought the component, recommended by Sir Syazwan.
Week 2 (FYP 2)
This is the circuit that I am going to construct. The table below show the component that I am going to use to construct it. This component for two circuits.
Week 1 (FYP 2)
For the first week of semester September, I proceed with construct the circuit. Start searching and buying the component.
Subscribe to:
Posts (Atom)